A strip-out removes the fitout and leaves the building. It is a different job from structural demolition — the constraints are lifts, loading docks, trading neighbours, retained services and a make-good clause, not excavators and site fencing.
If we miss your call, our automated assistant may text you to continue your service enquiry. Your details may be shared with a suitable independent local provider so they can contact you about the job. See our Privacy Policy.
What this covers
What strip out demolition means on this site
- Office, retail, hospitality and medical tenancy defits
- Removal of partitions, ceilings, floor coverings, joinery, shopfronts and non-structural walls
- Back-to-base works ahead of a new fitout
- Residential internal strip-outs ahead of a renovation
When a dedicated demolition provider is typically required
- A lease is ending and a make-good obligation applies
- A new fitout needs the tenancy returned to base building condition
- Internal walls, ceilings or services need removal without touching the structure
- The work happens inside an occupied building with other tenants
- Materials of the era may include asbestos-containing vinyl, linings, mastics or fire-rated board
Decision aid
Strip-out or structural demolition?
The single most useful thing to settle before calling is where the line sits between what is removed and what stays.
| Option | When it fits | Watch for |
|---|---|---|
| Non-structural strip-out | Partitions, ceilings, floor finishes, joinery and fitout services come out; the shell, slab and structure stay. | Which services are retained and live, and whether ceiling grids, sprinklers or air conditioning are staying. |
| Back-to-base defit | The tenancy is returned to the base building condition defined in the lease. | The definition of "base building" varies by lease. Get the make-good clause and any base building schedule before scoping. |
| Strip-out with selective structural work | A non-loadbearing wall, mezzanine or slab penetration is also being removed. | Anything structural needs engineering input and usually a separate approval path. See partial demolition. |
| Full building demolition | The building itself is coming down. | Completely different plant, approvals and site setup. See commercial demolition or house demolition. |
Work through the table first — the call is much shorter when the project type is settled.
Cost drivers
What changes the cost of strip out demolition
We do not publish price ranges. We have no verified provider pricing to publish, and a range invented for a website is worse than no number at all. What we can do is set out exactly which inputs move the figure, so you can have an informed conversation with whoever quotes the work.
- What is retained versus removed
Retained ceilings, sprinklers, air conditioning, lighting, shopfronts and floor finishes have to be protected and worked around, which is slower than clearing everything.
- Lift and loading access
Whether waste travels through a goods lift, a dock, a stairwell or a street frontage is often the biggest single driver of a multi-level strip-out.
- Permitted work hours
Building management frequently restricts noisy work to evenings or weekends in occupied buildings, which changes crew arrangements.
- Hazardous materials in fitout fabric
Older vinyl floor tiles, sheet linings, mastics, fire-rated board and gaskets can contain asbestos. Licensed removal is a separate scope with its own clearance step.
- Dust, noise and separation
Occupied neighbours usually require dust screening, negative pressure in some cases, protection of common areas and hoarding to the shopfront.
- Services isolation
Electrical, data, hydraulic, gas and fire services need isolating in a way that does not affect adjoining tenancies still operating.
- Waste separation and volume
Fitout waste is bulky and mixed. Separation for recycling takes space that a tenancy floor often does not have.
- Make-good specification
Patching, capping, painting, floor levelling and reinstating base building elements can be a substantial part of the scope, and it varies by lease.
Technical detail
The five items that decide the programme
Approvals and certifier considerations
Purely non-structural internal removal often has a different approval profile from structural demolition, but it is property- and scope-specific — particularly if a wall turns out to be loadbearing, if fire separation is affected or if the building is subject to overlays. Confirm with a licensed building certifier, and check building management or body corporate requirements, which are separate from council approval and frequently include their own application, insurance and induction process.
Utility disconnection and capping
In a strip-out the objective is usually isolation rather than disconnection. Electrical circuits, data, hydraulic services, gas and fire services often continue serving other parts of the building, so they need isolating at the right point. Fire services in particular — sprinklers, detection, exit and emergency lighting — usually need a licensed trade and building-management coordination, because impairing them affects the whole building.
Asbestos and hazardous materials
Fitout materials from earlier decades can contain asbestos: vinyl floor tiles and their adhesives, sheet linings behind later finishes, mastics, gaskets and some fire-rated board. If the building has an asbestos register, provide it. Removal of more than 10 square metres of non-friable asbestos requires a Class A or Class B licensed removalist, and friable asbestos requires a Class A licence. Other items to flag are lead paint in older shopfronts and refrigerant in retained plant.
Site access and neighbouring property
The details that matter are the floor level, whether there is a goods lift and its internal dimensions and weight limit, dock height and booking rules, whether waste can be taken through common areas or must go out of hours, and any protection required for lobbies, lifts and corridors. For ground-floor retail, note whether the shopfront can be used and whether hoarding is required.
Debris, disposal and site finish
Strip-out waste is high volume and mixed, and separating it depends on having somewhere to put it. Confirm what the tenant is removing themselves — signage, equipment, joinery or fixtures they own. Then agree the finish precisely: slab exposed and swept, walls patched, services capped and tagged, ceiling grid retained or removed, and whether the space is being handed to a landlord or straight to an incoming fitout contractor.
Site constraints panel
Site constraints that affect strip out demolition
These are the conditions that most often change how a demolition is carried out. None of this is an assessment of your property — it is what a provider will want to know before they can talk about method or price.
Narrow driveway or side access
Plant has to reach the structure. A side access that narrows at a gate, a meter box or a rainwater tank decides whether a machine can work at all.
What to check: Measure the narrowest point between the street and the work area, and the gate opening.
Neighbouring structures and boundaries
Close boundaries, shared fences, adjoining walls and buildings within a few metres usually mean protection and a more controlled sequence of removal.
What to check: Note how close the structure sits to each boundary and whether anything is shared.
Overhead services
Power and communications lines across a frontage or over a work area set minimum clearances and can restrict machine reach or require the supply authority to be involved.
What to check: Note any lines crossing the property or the access route.
Multi-level and loading access
In apartment and commercial buildings, the goods lift, dock and permitted work hours often govern the programme more than the work itself does.
What to check: Confirm the goods lift dimensions and weight limit, dock booking rules and permitted hours.
Known or suspected hazardous materials
Asbestos-containing material generally needs licensed removal before demolition, which sits ahead of the structural work in the programme.
What to check: Say whether an asbestos report or register exists — never try to identify material yourself.
Below-ground structures
Slabs, footings, piers, tanks, pool shells and old pavements add volume and can constrain what is built over the area afterwards.
What to check: List what is under the surface if you know, and what the block has to support next.
Process
What happens after the call
We take the enquiry and may refer it. The independent provider quotes, schedules and performs the work.
-
You call
You describe the property, the project type and your timeframe. It is a phone conversation — there is no form, no booking calendar and no chat widget on this site.
-
Scope and referral
We work out what the job actually is and whether it matches a suitable independent provider. With the required disclosure, your enquiry may be shared with that provider so they can contact you.
-
Provider assessment
The independent provider assesses the site, discusses availability and pricing, and is responsible for their own licences, insurance and the work. We do not quote on their behalf.
-
Approvals, utilities and hazards
A licensed certifier confirms the approval path, services are disconnected or capped, and any licensed asbestos removal is completed. These items usually set the earliest possible start date.
-
Work planning
The provider plans site setup, protection, method, waste handling and the agreed site finish, and schedules the work directly with you.
Materials & site finish
Where the material goes, and how the site is left
Two questions get skipped on most enquiries and then cause friction later: what happens to the material, and what condition the site has to be in at handover. Ask both up front. We do not publish recycling or diversion figures, because we have no verified provider data to publish.
Material streams and the question to ask
- Concrete, brick and masonry
-
Heavy relative to its volume and usually handled as its own stream. Slabs, footings, driveways, paths and pool shells all land here.
Ask: Is the slab in or out of scope, and does the driveway go too?
- Metal
-
Structural steel, roof sheeting, framing, fencing and plant are commonly separated where there is space on site to do it.
Ask: Is there anything metal you want kept rather than removed?
- Timber
-
Framing, flooring, decking and hardwood elements. Salvage has to happen before the structure comes down, not after.
Ask: Is any hardwood or flooring being salvaged, and by whom?
- Mixed and fitout waste
-
Plasterboard, insulation, ceilings, joinery and floor coverings. High volume, and separating it needs somewhere to put it.
Ask: Is there room on site to separate streams, or does everything go mixed?
- Regulated waste
-
Asbestos waste is a separate regulated stream that must go to a facility licensed to receive it, with the required wrapping, transport and documentation.
Ask: Who provides the removal documentation at completion?
Call preparation
What to have ready when you call
You do not need all of it, but the more you have the faster the conversation gets to something useful. Nothing on this page is collected — it is a checklist for the phone call.
- Building address, tenancy number and floor level
- Approximate tenancy area
- Previous use — office, retail, hospitality, medical, gym or other
- A copy of the make-good clause or base building schedule if one exists
- What is being retained: ceilings, lighting, air conditioning, sprinklers, shopfront, floor finishes
- Whether the building has an asbestos register
- Goods lift dimensions and weight limit, or dock access details
- Building management rules: permitted hours, inductions, insurance and protection requirements
- Whether neighbouring tenancies are trading
- The handover date and who is receiving the space
Questions
Strip Out Demolition questions
The questions that come up most often on this project type.
What does "back to base building" actually mean?
It depends on the lease. Some define base building precisely in a schedule; others describe it loosely and it becomes a negotiation with the landlord. Get the make-good clause and any base building schedule before the scope is set, because the difference between two readings can be a large part of the job.
Can a strip-out run while other tenants are trading?
Usually yes, with conditions. Building management commonly sets permitted hours, requires protection of common areas and lifts, and controls how waste moves through the building. Those rules shape the method more than the tenancy itself does.
Are internal walls safe to remove?
Not automatically. A wall can be loadbearing, contain fire separation, brace the structure or carry services. Anything that is not clearly non-structural needs engineering input before removal, which shifts the work toward partial demolition.
Could there be asbestos in a fitout?
It is possible in older fabric — vinyl tiles and adhesives, sheet linings hidden behind later finishes, mastics and some fire-rated board. If the building has an asbestos register, share it. Licensed removal requirements apply based on the material type and quantity, and a clearance step follows removal.
Who deals with the fire and sprinkler services?
Fire services normally require licensed trades and building-management coordination, because isolating or impairing them affects the whole building rather than just your tenancy. Identify early who is arranging that so it does not hold up the programme.
Call about your strip out demolition project
Internal demolition, tenancy defits and back-to-base works where the building structure stays in place. Tell us the suburb, the structure and roughly what is involved.
If we miss your call, our automated assistant may text you to continue your service enquiry. Your details may be shared with a suitable independent local provider so they can contact you about the job. See our Privacy Policy.